Commit Graph
14 Commits
Author SHA1 Message Date
hoelee 6f474b76e9 docs(linkedin): curate and package batch-02 articles for consultant review
Deploy / build (push) Successful in 24s
2026-10-27 18:55:04 +08:00
hoelee 69ce61a932 docs(review): apply batch-01 consultant fixes and update review status
Deploy / build (push) Successful in 23s
2026-10-27 06:15:27 +08:00
hoelee cd6511a0b3 docs(review): apply batch-04 consultant fixes and approve 5 tutorial/web3 posts
Deploy / build (push) Successful in 22s
- performUpkeep: external callable, re-check is mandatory security (not stale-data hygiene)
- BasicNft.tokenURI: ownerOf -> _ownerOf, dead custom error explained
- storage (SSTORE) vs EIP-170 runtime bytecode separated, derived ~1.3M gas for the two SVGs
- subs-15 retimed from a fresh faster-whisper word alignment (10.84s first line, was 28.22s) + SRT regenerated
- RDAP needs curl -L (bootstrap 302), ASN/Spamhaus blocklist check added
- learning-project framing -> Sepolia reference implementation / testnet validation build
- dynamicCta on the two posts that ended with no conversion block
- cross-links between the two NFT posts; tracker 91/91 approved
2026-10-27 06:13:00 +08:00
hoelee 01c55805fb docs(review): record consultant batch-05 re-review for the 11 devops posts
Deploy / build (push) Successful in 27s
Second pass on articles already approved in Batch-02. Real fixes landed in
19de315; this commit records the outcome, the items that were already fixed
before the reviewer's snapshot, and four reviewer misjudgements (the $TOKEN
'***' artefact comes from the batch-packaging scrubber, not the posts;
06's User Scripts explanation was already correct; 11's Round 3 was already
closed; the 'missing CTA' claims are false). One open question: 01's physical
hardware anchor is unverified and was deliberately not invented.

Tracker also carries the concurrently approved posts from the sibling session.
2026-10-27 06:10:59 +08:00
hoelee a7d1cbaf3a docs(review): record approval and feedback resolution for batch-03
Deploy / build (push) Successful in 29s
2026-10-27 06:09:20 +08:00
hoelee 738af631fb docs(review): regenerate remaining review batches 01-04 for 17 pending posts
Deploy / build (push) Successful in 32s
2026-10-27 05:37:58 +08:00
hoelee 732790a620 docs(review): update tracker timestamp 2026-10-27 05:33:01 +08:00
hoelee 1beba8d520 docs(review): add report-batch-05 for devops 11-post review package 2026-10-27 05:32:30 +08:00
hoelee 7b868f8687 docs(review): sync character count and timestamp in audit tracker
Deploy / build (push) Successful in 28s
2026-10-27 05:29:44 +08:00
hoelee a7e683100b review: apply external consultant editorial fixes and update audit tracker to 74/91 approved
Deploy / build (push) Successful in 28s
2026-10-27 05:29:08 +08:00
hoelee 050d73305d docs(review): record approval and feedback resolution for batch-02 (consultant batch-03)
Deploy / build (push) Successful in 33s
2026-10-27 04:24:26 +08:00
hoelee d454ebd505 docs(review): record approval and feedback resolution for batch-04 (consultant batch-05)
Deploy / build (push) Successful in 37s
2026-10-27 04:13:47 +08:00
hoelee 09596fe7a5 edit(content): review batch-2 editorial pass across 24 posts (EN + ZH)
Tracker at 20 approved / 71 pending. Same pass as batch 1: first person throughout,
no LAN IPs in prose, ZH twins normalised to simplified Chinese, dynamicCta where the
post ends on a concrete next step.
2026-10-27 04:07:00 +08:00
hoelee 86edd40c74 docs(review): consultant audit tracker, 10 post batches and the posts/case-studies upgrade plan
- docs/consultant-review/: review brief, per-batch post dumps (01-10),
  audit-tracker.json + AUDIT-TRACKER.md generated by scripts/manage_review.py
- scripts/manage_review.py: list/approve/approve-batch/generate over the tracker
- docs/consultant-review-2026-10-27-posts-and-casestudies-plan.md: locked
  decision register + 4 work orders for the /posts/ archive rework and the
  case-studies portfolio treatment
2026-10-27 03:28:58 +08:00