Files
hoelee-blog/docs
hoelee b0ada17fa7
Deploy / build (push) Successful in 29s
docs: live re-audit (2026-09-29) + Phase E distribution backlog
Re-checked the Sept research against the live site and the repo:
- 53 posts x 2 languages, 127 sitemap URLs, 133/133 internal links 200
- Mark C1 (per-post OG), D1 (search), B2b (draft bank) as done — they were stale as open
- New Phase E (top of the queue): E1 analytics (CF Web Analytics + GSC), E2 main-site ->
  blog link (deferred to the www.hoelee.com overhaul), E3 dev.to syndication, E4 ZH nav +
  /zh/posts/, E5 og:locale, E6 Cloudflare HTML caching, E7 volume guardrail, E8 hygiene
- New section 4: measured evidence table; conventions section renumbered
2026-09-29 03:07:51 +08:00
..